University of Toronto St. George data-centre renewal (2010)

University of Toronto · Toronto, Ontario

Record on-096 · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Historical

The 2010 renewal report locates the university’s existing main data centre in the McLennan Physics building on its St. George campus.

Evidence date
2010-11-02
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. University of Toronto St. George data-centre renewal (2010). Canadian Data Centre Atlas. Record on-096; claim pub-ontario_b-on-096-historical_location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2010-11-02; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-096/#claim-pub-ontario_b-on-096-historical_location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

The 2010 plan projected a 125 kW initial IT load; it is not a current measured load.

Evidence date
2010-11-02
Checked
2026-10-05
Scope
Facility · 2010 renewal Day 1
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
It
Basis
planned IT load
Reported quantity
125 kW · projected
Citation text (select to copy)

Clarion Solutions. University of Toronto St. George data-centre renewal (2010). Canadian Data Centre Atlas. Record on-096; claim pub-ontario_b-on-096-phase1_it. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2010-11-02; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-096/#claim-pub-ontario_b-on-096-phase1_it

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

The 2010 renewal concept allowed expansion to 350 kW of IT load; completion is unverified.

Evidence date
2010-11-02
Checked
2026-10-05
Scope
Facility · 2010 renewal end state
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
It
Basis
planned IT load
Reported quantity
350 kW · planned end state
Citation text (select to copy)

Clarion Solutions. University of Toronto St. George data-centre renewal (2010). Canadian Data Centre Atlas. Record on-096; claim pub-ontario_b-on-096-endstate_it. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2010-11-02; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-096/#claim-pub-ontario_b-on-096-endstate_it

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Planned

The plan proposed raised-floor cold-air delivery and rear-door extraction to a ceiling return plenum, with a separate redundant cooling plant.

Evidence date
2010-11-02
Checked
2026-10-05
Scope
Facility · 2010 renewal
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. University of Toronto St. George data-centre renewal (2010). Canadian Data Centre Atlas. Record on-096; claim pub-ontario_b-on-096-planned_airflow. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2010-11-02; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-096/#claim-pub-ontario_b-on-096-planned_airflow

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.