{"city":"Toronto","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-096-historical_location","attribute":"historical_location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":"2010-11-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-utoronto-plan"],"status":"historical","status_subject":"published_location_reference","unit":null,"value":"The 2010 renewal report locates the university’s existing main data centre in the McLennan Physics building on its St. George campus."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-096-phase1_it","attribute":"phase1_it","capacity_basis":"planned IT load","capacity_type":"IT","category":"capacity","claim_kind":"reported","evidence_date":"2010-11-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":125,"phase":"2010 renewal Day 1","qualifier":"projected","scope":"facility","source_ids":["pub-src-ontario_b-utoronto-plan"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"kW","value":"The 2010 plan projected a 125 kW initial IT load; it is not a current measured load."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-096-endstate_it","attribute":"endstate_it","capacity_basis":"planned IT load","capacity_type":"IT","category":"capacity","claim_kind":"reported","evidence_date":"2010-11-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":350,"phase":"2010 renewal end state","qualifier":"planned end state","scope":"facility","source_ids":["pub-src-ontario_b-utoronto-plan"],"status":"planned","status_subject":"capacity_at_stated_basis_and_scope","unit":"kW","value":"The 2010 renewal concept allowed expansion to 350 kW of IT load; completion is unverified."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-096-planned_airflow","attribute":"planned_airflow","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":"2010-11-02","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":"2010 renewal","qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-utoronto-plan"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The plan proposed raised-floor cold-air delivery and rear-door extraction to a ceiling return plenum, with a separate redundant cooling plant."}],"disposition":"campus_aggregate","field_provenance":{"city":["pub-src-ontario_b-utoronto-plan"],"disposition":["pub-src-ontario_b-utoronto-plan"],"name":["pub-src-ontario_b-utoronto-plan"],"operator":["pub-src-ontario_b-utoronto-plan"],"province":["pub-src-ontario_b-utoronto-plan"],"record_kind":["pub-src-ontario_b-utoronto-plan"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"University of Toronto St. George data-centre renewal (2010)","operator":"University of Toronto","placement":{"accessed_date":"2026-10-05","city":"Toronto","gazetteer_id":"6167865","gazetteer_modified_date":"2026-04-13","latitude":43.7064,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-79.3986,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6167865/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Ontario","record_id":"on-096","record_kind":"historical"}
