Historical · Evidence reviewed 2026-10-06
University of Toronto St. George data-centre renewal (2010)
University of Toronto · Toronto, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: University of Toronto
- Operator: University of Toronto
- Province: University of Toronto
- City: University of Toronto
- Record kind: University of Toronto
- Disposition: University of Toronto
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0
Location
HistoricalThe 2010 renewal report locates the university’s existing main data centre in the McLennan Physics building on its St. George campus.
- Evidence date
- 2010-11-02
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Renewal of the St. George Campus Data Centre: Project Planning Report · University of Toronto
Capacity
PlannedThe 2010 plan projected a 125 kW initial IT load; it is not a current measured load.
- Evidence date
- 2010-11-02
- Checked
- 2026-10-05
- Scope
- Facility · 2010 renewal Day 1
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- It
- Basis
- planned IT load
- Reported quantity
- 125 kW · projected
- Renewal of the St. George Campus Data Centre: Project Planning Report · University of Toronto
Capacity
PlannedThe 2010 renewal concept allowed expansion to 350 kW of IT load; completion is unverified.
- Evidence date
- 2010-11-02
- Checked
- 2026-10-05
- Scope
- Facility · 2010 renewal end state
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- It
- Basis
- planned IT load
- Reported quantity
- 350 kW · planned end state
- Renewal of the St. George Campus Data Centre: Project Planning Report · University of Toronto
Cooling
PlannedThe plan proposed raised-floor cold-air delivery and rear-door extraction to a ceiling return plenum, with a separate redundant cooling plant.
- Evidence date
- 2010-11-02
- Checked
- 2026-10-05
- Scope
- Facility · 2010 renewal
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Renewal of the St. George Campus Data Centre: Project Planning Report · University of Toronto