Spruce Lake AI Data Centre project
Beacon New Brunswick / VoltaGrid · Saint John, New Brunswick
Record nb-beacon-spruce-lake · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- disposition: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- name: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- operator: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- province: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- record_kind: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
Lifecycle
ProposedThe federal registry describes the Spruce Lake proposal near Saint John; the project was under designation-request consideration in September 2026.
- Evidence date
- 2026-09-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Spruce Lake AI Data Centre Project · Impact Assessment Agency of Canada
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-1
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-09-15; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Location
ReportedBeacon and VoltaGrid’s April 2026 EIA places the proposed data centre in Saint John’s Spruce Lake Industrial Park expansion.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-2
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-04-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedThe April EIA describes a 390 MW data-centre project.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- EIA overall proposed rating; not verified usable IT capacity
- Reported quantity
- 390 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-3
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-04-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedThe April EIA proposes 200 MW from the NB Power grid, dependent on new infrastructure.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Utility supply
- Basis
- proposed grid supply; no completed connection or executed supply demonstrated
- Reported quantity
- 200 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-4
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-04-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedThe EIA proposes 190 MW of behind-the-meter natural-gas generation.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Generation
- Basis
- proposed generating plant, not additional computing capacity
- Reported quantity
- 190 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-5
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-04-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-5
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedThe developer’s undated site markets 400 MW total demand and up to 210 MW grid supply, differing from the April EIA’s 390/200 MW figures.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- undated marketing scenario; inconsistent design figures are not summed
- Saint John AI Data Centre · Spruce Lake AI Data Centre project
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-6
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-6
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
PlannedThe April EIA proposes closed-loop liquid cooling with industrial-water initial fill and limited makeup; it does not establish water-free operation.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Permanent claim link · Claim pub-quebec-east-nb-beacon-spruce-lake-7
Citation text (select to copy)
Clarion Solutions. Spruce Lake AI Data Centre project. Canadian Data Centre Atlas. Record nb-beacon-spruce-lake; claim pub-quebec-east-nb-beacon-spruce-lake-7. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-04-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nb-beacon-spruce-lake/#claim-pub-quebec-east-nb-beacon-spruce-lake-7
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.