Project · Evidence reviewed 2026-10-06
Spruce Lake AI Data Centre project
Beacon New Brunswick / VoltaGrid · Saint John, New Brunswick
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- Operator: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- Province: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- City: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- Record kind: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
- Disposition: Impact Assessment Agency of Canada, Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick, Spruce Lake AI Data Centre project
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6138517 · CC BY 4.0
Lifecycle
ProposedThe federal registry describes the Spruce Lake proposal near Saint John; the project was under designation-request consideration in September 2026.
- Evidence date
- 2026-09-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Spruce Lake AI Data Centre Project · Impact Assessment Agency of Canada
Location
ReportedBeacon and VoltaGrid’s April 2026 EIA places the proposed data centre in Saint John’s Spruce Lake Industrial Park expansion.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Capacity
PlannedThe April EIA describes a 390 MW data-centre project.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- EIA overall proposed rating; not verified usable IT capacity
- Reported quantity
- 390 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Capacity
PlannedThe April EIA proposes 200 MW from the NB Power grid, dependent on new infrastructure.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Utility supply
- Basis
- proposed grid supply; no completed connection or executed supply demonstrated
- Reported quantity
- 200 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Capacity
PlannedThe EIA proposes 190 MW of behind-the-meter natural-gas generation.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Generation
- Basis
- proposed generating plant, not additional computing capacity
- Reported quantity
- 190 MW
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick
Capacity
PlannedThe developer’s undated site markets 400 MW total demand and up to 210 MW grid supply, differing from the April EIA’s 390/200 MW figures.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- undated marketing scenario; inconsistent design figures are not summed
- Saint John AI Data Centre · Spruce Lake AI Data Centre project
Cooling
PlannedThe April EIA proposes closed-loop liquid cooling with industrial-water initial fill and limited makeup; it does not establish water-free operation.
- Evidence date
- 2026-04-10
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- Technical Report Template · Beacon New Brunswick and VoltaGrid; Stantec EIA filed with New Brunswick