{"city":"Saint John","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-1","attribute":"status","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-09-15","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-0f5f3d15e577"],"status":"proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"The federal registry describes the Spruce Lake proposal near Saint John; the project was under designation-request consideration in September 2026."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-2","attribute":"city","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":"2026-04-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-19390ab60dcb"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"Beacon and VoltaGrid’s April 2026 EIA places the proposed data centre in Saint John’s Spruce Lake Industrial Park expansion."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-3","attribute":"capacity","capacity_basis":"EIA overall proposed rating; not verified usable IT capacity","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":"2026-04-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":390,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-19390ab60dcb"],"status":"planned","status_subject":"reported_capacity","unit":"MW","value":"The April EIA describes a 390 MW data-centre project."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-4","attribute":"capacity","capacity_basis":"proposed grid supply; no completed connection or executed supply demonstrated","capacity_type":"utility_supply","category":"capacity","claim_kind":"reported","evidence_date":"2026-04-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":200,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-19390ab60dcb"],"status":"planned","status_subject":"reported_capacity","unit":"MW","value":"The April EIA proposes 200 MW from the NB Power grid, dependent on new infrastructure."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-5","attribute":"capacity","capacity_basis":"proposed generating plant, not additional computing capacity","capacity_type":"generation","category":"capacity","claim_kind":"reported","evidence_date":"2026-04-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":190,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-19390ab60dcb"],"status":"planned","status_subject":"reported_capacity","unit":"MW","value":"The EIA proposes 190 MW of behind-the-meter natural-gas generation."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-6","attribute":"capacity","capacity_basis":"undated marketing scenario; inconsistent design figures are not summed","capacity_type":"facility_power","category":"capacity","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-5372da07aa37"],"status":"planned","status_subject":"reported_capacity","unit":null,"value":"The developer’s undated site markets 400 MW total demand and up to 210 MW grid supply, differing from the April EIA’s 390/200 MW figures."},{"accessed_date":"2026-10-05","assertion_id":"pub-quebec-east-nb-beacon-spruce-lake-7","attribute":"cooling","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":"2026-04-10","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-quebec-east-19390ab60dcb"],"status":"planned","status_subject":"cooling_configuration","unit":null,"value":"The April EIA proposes closed-loop liquid cooling with industrial-water initial fill and limited makeup; it does not establish water-free operation."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"],"disposition":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"],"name":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"],"operator":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"],"province":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"],"record_kind":["pub-src-quebec-east-0f5f3d15e577","pub-src-quebec-east-19390ab60dcb","pub-src-quebec-east-5372da07aa37"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"Spruce Lake AI Data Centre project","operator":"Beacon New Brunswick / VoltaGrid","placement":{"accessed_date":"2026-10-05","city":"Saint John","gazetteer_id":"6138517","gazetteer_modified_date":"2025-08-04","latitude":45.2708,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-66.0562,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6138517/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"New Brunswick","record_id":"nb-beacon-spruce-lake","record_kind":"project"}
