Version-specific research record
Almaguin Data Armour proposal (historical)
Almaguin Data · Armour Township, Ontario
Record on-169 · 2026-10-06-83c11c799ab4-public-2026-10-07
Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- name: Almaguin Data
- operator: Almaguin Data
- province: Almaguin Data
- city: Almaguin Data
- record_kind: Almaguin Data
- disposition: Almaguin Data
Capacity
Historical proposalThe developer described an initial 2 MW modular deployment for its Armour Township proposal. This was a design plan, not operating IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · initial
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power
- Basis
- historical proposal; commissioning not established
- Reported quantity
- 2 MW
- Almaguin Data – Northern Ontario AI Data Centre · Almaguin Data
Permanent claim link · Claim pub-ontario_a-on-169-1
Citation text (select to copy)
Clarion Solutions. Almaguin Data Armour proposal (historical). Canadian Data Centre Atlas. Record on-169; claim pub-ontario_a-on-169-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-169/#claim-pub-ontario_a-on-169-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
Historical proposalThe historical master plan contemplated expansion to 10 MW.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Campus total
- Basis
- historical master-plan target
- Reported quantity
- 10 MW
- Almaguin Data – Northern Ontario AI Data Centre · Almaguin Data
Permanent claim link · Claim pub-ontario_a-on-169-2
Citation text (select to copy)
Clarion Solutions. Almaguin Data Armour proposal (historical). Canadian Data Centre Atlas. Record on-169; claim pub-ontario_a-on-169-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-169/#claim-pub-ontario_a-on-169-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
Historical proposalThe proposed electrical design used a customer-owned 44 kV substation and 2 MVA transformer; energization is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Almaguin Data – Northern Ontario AI Data Centre · Almaguin Data
Permanent claim link · Claim pub-ontario_a-on-169-3
Citation text (select to copy)
Clarion Solutions. Almaguin Data Armour proposal (historical). Canadian Data Centre Atlas. Record on-169; claim pub-ontario_a-on-169-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-169/#claim-pub-ontario_a-on-169-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
Historical proposalThe proposal described direct-to-chip liquid loops using ambient-air heat rejection. This does not establish installed equipment.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Almaguin Data – Northern Ontario AI Data Centre · Almaguin Data
Permanent claim link · Claim pub-ontario_a-on-169-4
Citation text (select to copy)
Clarion Solutions. Almaguin Data Armour proposal (historical). Canadian Data Centre Atlas. Record on-169; claim pub-ontario_a-on-169-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-169/#claim-pub-ontario_a-on-169-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.