CLARION Data projects

Browse this record in the Atlas

Historical · Evidence reviewed 2026-10-06

Almaguin Data Armour proposal (historical)

Almaguin Data · Armour Township, Ontario

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

No unique reviewed city reference. Intentionally unpinned.

Capacity

Historical proposal

The developer described an initial 2 MW modular deployment for its Armour Township proposal. This was a design plan, not operating IT capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility · initial
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Facility power
Basis
historical proposal; commissioning not established
Reported quantity
2 MW

Capacity

Historical proposal

The historical master plan contemplated expansion to 10 MW.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Campus total
Basis
historical master-plan target
Reported quantity
10 MW

Power

Historical proposal

The proposed electrical design used a customer-owned 44 kV substation and 2 MVA transformer; energization is not established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Historical proposal

The proposal described direct-to-chip liquid loops using ambient-air heat rejection. This does not establish installed equipment.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope