Identity provenance

Location

Reported

EdgeConneX markets TOR01 in Toronto; Cogent independently lists it at 565 Gordon Baker Road, North York.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Operator marketed facility identity
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Reported

The operator’s current sheet specifies 1 MW with N+1 redundancy. It does not explicitly establish the IT-versus-utility basis.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Unspecified power
Basis
operator technical-sheet rating; basis not explicit
Reported quantity
1 MW
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

The sheet describes a planned scalable total of 3 MW, not a delivered expansion.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Unspecified power
Basis
planned scalable total
Reported quantity
3 MW
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Installed

The power design is described as concurrently maintainable with at least N+1 PDU, UPS and generator components; fuel and utility agreements are not disclosed.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Reported

The TOR01 sheet specifies a 30-inch underfloor air plenum and N+1 CRAC units in separate suites.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Connectivity

Reported

The sheet describes diverse entrances and meet-me rooms, naming Beanfield, Bell Canada, Cogeco, Cogent, Hurricane Electric and Zayo. End-to-end physical route independence is not audited.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity infrastructure or service
Citation text (select to copy)

Clarion Solutions. EdgeConneX TOR01 / EDCTOR01. Canadian Data Centre Atlas. Record on-122; claim pub-ontario_a-on-122-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-122/#claim-pub-ontario_a-on-122-6

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.