Facility · Evidence reviewed 2026-10-06
EdgeConneX TOR01 / EDCTOR01
EdgeConneX · Toronto, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: EdgeConneX, Cogent Communications
- Operator: EdgeConneX, Cogent Communications
- Province: EdgeConneX, Cogent Communications
- City: EdgeConneX, Cogent Communications
- Record kind: EdgeConneX, Cogent Communications
- Disposition: EdgeConneX, Cogent Communications
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0
Location
ReportedEdgeConneX markets TOR01 in Toronto; Cogent independently lists it at 565 Gordon Baker Road, North York.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Operator marketed facility identity
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX
- Toronto service locations, page 2 · Cogent Communications
Capacity
ReportedThe operator’s current sheet specifies 1 MW with N+1 redundancy. It does not explicitly establish the IT-versus-utility basis.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified power
- Basis
- operator technical-sheet rating; basis not explicit
- Reported quantity
- 1 MW
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX
Capacity
PlannedThe sheet describes a planned scalable total of 3 MW, not a delivered expansion.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified power
- Basis
- planned scalable total
- Reported quantity
- 3 MW
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX
Power
InstalledThe power design is described as concurrently maintainable with at least N+1 PDU, UPS and generator components; fuel and utility agreements are not disclosed.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX
Cooling
ReportedThe TOR01 sheet specifies a 30-inch underfloor air plenum and N+1 CRAC units in separate suites.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX
Connectivity
ReportedThe sheet describes diverse entrances and meet-me rooms, naming Beanfield, Bell Canada, Cogeco, Cogent, Hurricane Electric and Zayo. End-to-end physical route independence is not audited.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
- EdgeConneX TOR01 Toronto technical data sheet · EdgeConneX