Identity provenance

Lifecycle

Historical

Smith + Andersen describes an RBC data-centre upgrade completed in 2008; this project account does not revalidate present-day operation.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-historical_project. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-historical_project

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Location

Reported

The engineering account places the RBC data centre at 75 Southgate Drive in Guelph, Ontario.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Reported

The 2008 works increased the existing UPS rating to 2,250 kW; this is historical equipment capacity, not current site draw.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Ups rating
Basis
historical 2008 upgraded UPS rating
Reported quantity
2250 kW
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-ups_upgrade. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-ups_upgrade

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Historical

The engineer describes UPS and diesel-generator systems in the project design.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-power. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-power

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Historical

The historical design included chilled-water mainframe cooling, computer-room air conditioners and constant-volume ventilation; office ventilation was separate.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-cooling. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-cooling

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The project account identifies Royal Bank of Canada as client; it is not a current land-title search.

Evidence date
2008
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. RBC Guelph Computer Centre. Canadian Data Centre Atlas. Record on-086; claim pub-ontario_b-on-086-client. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2008; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-086/#claim-pub-ontario_b-on-086-client

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.