Historical · Evidence reviewed 2026-10-06
RBC Guelph Computer Centre
Royal Bank of Canada · Guelph, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Smith + Andersen
- Operator: Smith + Andersen
- Province: Smith + Andersen
- City: Smith + Andersen
- Record kind: Smith + Andersen
- Disposition: Smith + Andersen
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5967629 · CC BY 4.0
Lifecycle
HistoricalSmith + Andersen describes an RBC data-centre upgrade completed in 2008; this project account does not revalidate present-day operation.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- RBC Guelph Data Centre engineering project · Smith + Andersen
Location
ReportedThe engineering account places the RBC data centre at 75 Southgate Drive in Guelph, Ontario.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- RBC Guelph Data Centre engineering project · Smith + Andersen
Capacity
ReportedThe 2008 works increased the existing UPS rating to 2,250 kW; this is historical equipment capacity, not current site draw.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Ups rating
- Basis
- historical 2008 upgraded UPS rating
- Reported quantity
- 2250 kW
- RBC Guelph Data Centre engineering project · Smith + Andersen
Power
HistoricalThe engineer describes UPS and diesel-generator systems in the project design.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- RBC Guelph Data Centre engineering project · Smith + Andersen
Cooling
HistoricalThe historical design included chilled-water mainframe cooling, computer-room air conditioners and constant-volume ventilation; office ventilation was separate.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- RBC Guelph Data Centre engineering project · Smith + Andersen
Ownership
ReportedThe project account identifies Royal Bank of Canada as client; it is not a current land-title search.
- Evidence date
- 2008
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- RBC Guelph Data Centre engineering project · Smith + Andersen