CLARION Data projects

Version-specific research record

Chip WAT1

CHIP Data Centers · Waterloo, Ontario

Record on-067 · 2026-10-06-83c11c799ab4-public-2026-10-07

Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

CHIP Data Centers identifies WAT1 in Waterloo, Ontario. No street address or parcel ownership is established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Operator marketed facility identity
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Marketed

The marketed design combines grid supply, N+1 UPS and diesel backup, with 48-hour backup runtime.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Marketed

CHIP advertises air and liquid-to-chip cooling for racks up to 200 kW; installed scope is not independently established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Hardware

Supported

NVIDIA B300 and GB300 NVL72 are listed as supported hardware, not an installed or purchased fleet.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hardware deployment procurement or support
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Marketed

WAT1 markets 4 MW ready-for-service in 2026; its detailed table separates 2 MW primary power and 2 MW expansion. These are operator schedules, not verified energized IT load.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Quantity type
Unspecified power
Basis
marketed 2026 RFS total
Reported quantity
4 MW
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

The operator targets 8 MW total in 2027.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Unspecified power
Basis
2027 target
Reported quantity
8 MW
Citation text (select to copy)

Clarion Solutions. Chip WAT1. Canadian Data Centre Atlas. Record on-067; claim pub-ontario_a-on-067-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-067/#claim-pub-ontario_a-on-067-6

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.