Version-specific research record
Spencer Building Carrier Hotel / Colo5 / MMR5
Spencer Building Carrier Hotel · Vancouver, British Columbia
Record bc-spencer · 2026-10-06-83c11c799ab4-public-2026-10-07
Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- name: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- operator: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- province: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- city: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- record_kind: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- disposition: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
Location
ReportedVancouver, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-1
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Lifecycle
Spencer markets operating colocation and meet-me-room services alongside powered-shell expansion. A shell being available is not evidence of commissioned tenant IT.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-2
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
Phased designThe technical sheet separates 8 MW total power from 4.7 MW IT across two 2.35 MW halls, with the second hall still a later phase. The first hall’s 2025 shell milestone is not proof of tenant commissioning. These quantities are non-additive design scopes.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power
- Basis
- design
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-3
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
DesignThe powered-shell design uses BC Hydro conductors and diesel standby generation; tenant UPS is separate. Generator nameplate is not usable IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · Phase 1
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-4
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
DesignThe first-phase design identifies air-cooled magnetic-bearing chillers; Colo5 separately describes raised-floor cold-aisle distribution.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · Powered shell/Colo5
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-5
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-5
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Connectivity
The operator describes new east/west fibre entrances and meet-me-room links to the Harbour Centre complex.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-6
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-6
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Commercial
MarketedThe first shell is offered for concurrent tenant fit-out. Colo5’s page advertises a 100 kW first phase; its old Q1 2025 second-phase target is not completion evidence.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-7
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-7. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-7
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Ownership
ReportedThe reviewed source identifies Spencer Building Carrier Hotel in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Permanent claim link · Claim pub-bc-spencer-review-8
Citation text (select to copy)
Clarion Solutions. Spencer Building Carrier Hotel / Colo5 / MMR5. Canadian Data Centre Atlas. Record bc-spencer; claim pub-bc-spencer-review-8. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-spencer/#claim-pub-bc-spencer-review-8
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.