Campus · Evidence reviewed 2026-10-06
Spencer Building Carrier Hotel / Colo5 / MMR5
Spencer Building Carrier Hotel · Vancouver, British Columbia
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- Operator: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- Province: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- City: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- Record kind: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
- Disposition: Spencer Building Carrier Hotel, Spencer Building Carrier Hotel, Spencer Building Carrier Hotel
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6173331 · CC BY 4.0
Location
ReportedVancouver, British Columbia. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Lifecycle
Spencer markets operating colocation and meet-me-room services alongside powered-shell expansion. A shell being available is not evidence of commissioned tenant IT.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Capacity
Phased designThe technical sheet separates 8 MW total power from 4.7 MW IT across two 2.35 MW halls, with the second hall still a later phase. The first hall’s 2025 shell milestone is not proof of tenant commissioning. These quantities are non-additive design scopes.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power
- Basis
- design
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Power
DesignThe powered-shell design uses BC Hydro conductors and diesel standby generation; tenant UPS is separate. Generator nameplate is not usable IT capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · Phase 1
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Cooling
DesignThe first-phase design identifies air-cooled magnetic-bearing chillers; Colo5 separately describes raised-floor cold-aisle distribution.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · Powered shell/Colo5
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Connectivity
The operator describes new east/west fibre entrances and meet-me-room links to the Harbour Centre complex.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Commercial
MarketedThe first shell is offered for concurrent tenant fit-out. Colo5’s page advertises a 100 kW first phase; its old Q1 2025 second-phase target is not completion evidence.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel
Ownership
ReportedThe reviewed source identifies Spencer Building Carrier Hotel in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Colo5 – Spencer Building · Spencer Building Carrier Hotel
- Spencer Building · Spencer Building Carrier Hotel
- SBCH Powered Shell Technical One-Pager Final · Spencer Building Carrier Hotel