Hut 8 Drumheller / American Bitcoin compute site

Hut 8 / American Bitcoin · Drumheller, Alberta

Record ab-hut8-drumheller · 2026-10-06-83c11c799ab4-public-2026-10-07

Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Drumheller, Alberta. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Hut 8 Drumheller / American Bitcoin compute site. Canadian Data Centre Atlas. Record ab-hut8-drumheller; claim pub-ab-hut8-drumheller-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-hut8-drumheller/#claim-pub-ab-hut8-drumheller-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Operating

Issuer disclosures report re-energization of Drumheller in 2026 and completion of an additional miner deployment in April. These supersede the March 2024 closure as the latest operating evidence.

Evidence date
2026-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. Hut 8 Drumheller / American Bitcoin compute site. Canadian Data Centre Atlas. Record ab-hut8-drumheller; claim pub-ab-hut8-drumheller-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2026-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-hut8-drumheller/#claim-pub-ab-hut8-drumheller-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Hardware

Installed

American Bitcoin reports energizing approximately 11,298 additional Bitmain S21 XP ASIC miners. These are bitcoin-mining ASICs, not GPUs.

Evidence date
2026-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hardware deployment procurement or support
Citation text (select to copy)

Clarion Solutions. Hut 8 Drumheller / American Bitcoin compute site. Canadian Data Centre Atlas. Record ab-hut8-drumheller; claim pub-ab-hut8-drumheller-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2026-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-hut8-drumheller/#claim-pub-ab-hut8-drumheller-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Historical

The 2024 closure release describes grid prices and supply problems at Drumheller. That is historical grid-connection evidence, not a current power-quality assessment.

Evidence date
2024-03-06
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Hut 8 Drumheller / American Bitcoin compute site. Canadian Data Centre Atlas. Record ab-hut8-drumheller; claim pub-ab-hut8-drumheller-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2024-03-06; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-hut8-drumheller/#claim-pub-ab-hut8-drumheller-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies Hut 8 / American Bitcoin in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Hut 8 Drumheller / American Bitcoin compute site. Canadian Data Centre Atlas. Record ab-hut8-drumheller; claim pub-ab-hut8-drumheller-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-hut8-drumheller/#claim-pub-ab-hut8-drumheller-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.