Facility · Evidence reviewed 2026-10-06
Hut 8 Drumheller / American Bitcoin compute site
Hut 8 / American Bitcoin · Drumheller, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
- Operator: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
- Province: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
- City: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
- Record kind: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
- Disposition: Issuer filing on U.S. Securities and Exchange Commission, Issuer press release via PR Newswire, Issuer press release via GlobeNewswire
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5942798 · CC BY 4.0
Location
ReportedDrumheller, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Hut 8 Corp._March 31, 2026 · Issuer filing on U.S. Securities and Exchange Commission
- American Bitcoin Completes Energization of ~11,298 Additional ASICs at Drumheller Site, Adding ~3.05 EH/s to Operational Fleet · Issuer press release via PR Newswire
- Hut 8 Streamlines Operations with Closure of Drumheller · Issuer press release via GlobeNewswire
Lifecycle
Issuer disclosures report re-energization of Drumheller in 2026 and completion of an additional miner deployment in April. These supersede the March 2024 closure as the latest operating evidence.
- Evidence date
- 2026-04
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Hut 8 Corp._March 31, 2026 · Issuer filing on U.S. Securities and Exchange Commission
- American Bitcoin Completes Energization of ~11,298 Additional ASICs at Drumheller Site, Adding ~3.05 EH/s to Operational Fleet · Issuer press release via PR Newswire
- Hut 8 Streamlines Operations with Closure of Drumheller · Issuer press release via GlobeNewswire
Hardware
InstalledAmerican Bitcoin reports energizing approximately 11,298 additional Bitmain S21 XP ASIC miners. These are bitcoin-mining ASICs, not GPUs.
- Evidence date
- 2026-04
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Hardware deployment procurement or support
- Hut 8 Corp._March 31, 2026 · Issuer filing on U.S. Securities and Exchange Commission
- American Bitcoin Completes Energization of ~11,298 Additional ASICs at Drumheller Site, Adding ~3.05 EH/s to Operational Fleet · Issuer press release via PR Newswire
- Hut 8 Streamlines Operations with Closure of Drumheller · Issuer press release via GlobeNewswire
Power
HistoricalThe 2024 closure release describes grid prices and supply problems at Drumheller. That is historical grid-connection evidence, not a current power-quality assessment.
- Evidence date
- 2024-03-06
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Hut 8 Corp._March 31, 2026 · Issuer filing on U.S. Securities and Exchange Commission
- American Bitcoin Completes Energization of ~11,298 Additional ASICs at Drumheller Site, Adding ~3.05 EH/s to Operational Fleet · Issuer press release via PR Newswire
- Hut 8 Streamlines Operations with Closure of Drumheller · Issuer press release via GlobeNewswire
Ownership
ReportedThe reviewed source identifies Hut 8 / American Bitcoin in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Hut 8 Corp._March 31, 2026 · Issuer filing on U.S. Securities and Exchange Commission
- American Bitcoin Completes Energization of ~11,298 Additional ASICs at Drumheller Site, Adding ~3.05 EH/s to Operational Fleet · Issuer press release via PR Newswire
- Hut 8 Streamlines Operations with Closure of Drumheller · Issuer press release via GlobeNewswire