CLARION Data projects

Version-specific research record

eStruxture CAL-3

eStruxture · Rocky View County, Alberta

Record ab-estruxture-cal3 · 2026-10-06-83c11c799ab4-public-2026-10-07

Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Rocky View County, Alberta. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Development marketed

The reviewed material describes CAL-3’s development and launch marketing; it does not establish actual energized customer IT load.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published identity or service listing
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Design

The datasheet distinguishes 90 MW total facility power from 70 MW critical power within that total. They are non-additive design specifications, not measured consumption.

Evidence date
Undated source
Checked
2026-10-05
Scope
Phase · Phase 1 / six halls
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Facility power
Basis
design
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Planned

The specification describes multiple utility feeds, UPS support and backup generation. The web page identifies diesel backup; equipment topology is not a measured availability guarantee.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Planned

eStruxture describes a recirculating water-based design with air and direct-to-chip options; availability depends on deployment density.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Connectivity

Planned

The operator describes diverse entrances and two meet-me rooms as part of the facility design. Independent route-level commissioning is not established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity infrastructure or service
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-6

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Commercial

Contracted

On 14 May 2026 eStruxture announced CoreWeave as anchor for part of CAL-3 Phase 1. It does not disclose contracted MW; sold-out marketing is not converted into a numeric tenancy figure.

Evidence date
2026-05-14
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Commercial disclosure or relationship
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-7. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2026-05-14; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-7

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies eStruxture in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. eStruxture CAL-3. Canadian Data Centre Atlas. Record ab-estruxture-cal3; claim pub-ab-estruxture-cal3-review-8. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-estruxture-cal3/#claim-pub-ab-estruxture-cal3-review-8

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.