Campus · Evidence reviewed 2026-10-06
eStruxture CAL-3
eStruxture · Rocky View County, Alberta
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: eStruxture, eStruxture, eStruxture
- Operator: eStruxture, eStruxture, eStruxture
- Province: eStruxture, eStruxture, eStruxture
- City: eStruxture, eStruxture, eStruxture
- Record kind: eStruxture, eStruxture, eStruxture
- Disposition: eStruxture, eStruxture, eStruxture
No unique reviewed city reference. Intentionally unpinned.
Location
ReportedRocky View County, Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
Lifecycle
Development marketedThe reviewed material describes CAL-3’s development and launch marketing; it does not establish actual energized customer IT load.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published identity or service listing
Capacity
DesignThe datasheet distinguishes 90 MW total facility power from 70 MW critical power within that total. They are non-additive design specifications, not measured consumption.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Phase · Phase 1 / six halls
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power
- Basis
- design
Power
PlannedThe specification describes multiple utility feeds, UPS support and backup generation. The web page identifies diesel backup; equipment topology is not a measured availability guarantee.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
Cooling
PlannedeStruxture describes a recirculating water-based design with air and direct-to-chip options; availability depends on deployment density.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
Connectivity
PlannedThe operator describes diverse entrances and two meet-me rooms as part of the facility design. Independent route-level commissioning is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
Commercial
ContractedOn 14 May 2026 eStruxture announced CoreWeave as anchor for part of CAL-3 Phase 1. It does not disclose contracted MW; sold-out marketing is not converted into a numeric tenancy figure.
- Evidence date
- 2026-05-14
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
Ownership
ReportedThe reviewed source identifies eStruxture in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship