CLARION Data projects

Version-specific research record

SPUR Gartshore campus proposal

SPUR Innovation Centre · Fergus, Ontario

Record on-new-spur-fergus-gartshore · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Proposed

SPUR proposes converting the former copper-tubing site at 865 Gartshore Street, Fergus, into a data-centre, agriculture and innovation campus.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. SPUR Gartshore campus proposal. Canadian Data Centre Atlas. Record on-new-spur-fergus-gartshore; claim pub-ontario_b-on-new-spur-fergus-gartshore-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-new-spur-fergus-gartshore/#claim-pub-ontario_b-on-new-spur-fergus-gartshore-location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power readiness

Application planned

SPUR says it is filing a 10 MW Phase 1 load application; its disclaimer makes power a design target subject to utility and interconnection approvals.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus · Phase 1
Evidence type
Reported
Status describes
Power milestone at stated scope
Quantity type
Utility load
Basis
proposed utility load
Reported quantity
10 MW · design target; not approved or energized
Citation text (select to copy)

Clarion Solutions. SPUR Gartshore campus proposal. Canadian Data Centre Atlas. Record on-new-spur-fergus-gartshore; claim pub-ontario_b-on-new-spur-fergus-gartshore-phase1_application. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-new-spur-fergus-gartshore/#claim-pub-ontario_b-on-new-spur-fergus-gartshore-phase1_application

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Planned

The current concept specifies air/convection cooling; any liquid-cooling or pond use would be closed-loop. Heat reuse for greenhouses is proposed where feasible.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. SPUR Gartshore campus proposal. Canadian Data Centre Atlas. Record on-new-spur-fergus-gartshore; claim pub-ontario_b-on-new-spur-fergus-gartshore-cooling_design. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-new-spur-fergus-gartshore/#claim-pub-ontario_b-on-new-spur-fergus-gartshore-cooling_design

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.