{"city":"Fergus","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-new-spur-fergus-gartshore-location","attribute":"location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"status":"proposed","status_subject":"published_location_reference","unit":null,"value":"SPUR proposes converting the former copper-tubing site at 865 Gartshore Street, Fergus, into a data-centre, agriculture and innovation campus."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-new-spur-fergus-gartshore-phase1_application","attribute":"phase1_application","capacity_basis":"proposed utility load","capacity_type":"utility_load","category":"power_readiness","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":10,"phase":"Phase 1","qualifier":"design target; not approved or energized","scope":"campus","source_ids":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"status":"application_planned","status_subject":"power_milestone_at_stated_scope","unit":"MW","value":"SPUR says it is filing a 10 MW Phase 1 load application; its disclaimer makes power a design target subject to utility and interconnection approvals."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-new-spur-fergus-gartshore-cooling_design","attribute":"cooling_design","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":null,"evidence_date_precision":null,"facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"campus","source_ids":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"status":"planned","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"The current concept specifies air/convection cooling; any liquid-cooling or pond use would be closed-loop. Heat reuse for greenhouses is proposed where feasible."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"disposition":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"name":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"operator":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"province":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"],"record_kind":["pub-src-ontario_b-rev-20261003-c2ce72b325cb"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"SPUR Gartshore campus proposal","operator":"SPUR Innovation Centre","placement":{"accessed_date":"2026-10-05","city":"Fergus","gazetteer_id":"7871320","gazetteer_modified_date":"2023-01-17","latitude":43.706,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-80.3776,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/7871320/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Ontario","record_id":"on-new-spur-fergus-gartshore","record_kind":"project"}
