Version-specific research record
55H Brampton
55H / Core Data Centres · Brampton, Ontario
Record on-117 · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: 55H, Core Data Centres, 55H, distributed by PR Newswire
- disposition: 55H, Core Data Centres, 55H, distributed by PR Newswire
- name: 55H, Core Data Centres, 55H, distributed by PR Newswire
- operator: 55H, Core Data Centres, 55H, distributed by PR Newswire
- province: 55H, Core Data Centres, 55H, distributed by PR Newswire
- record_kind: 55H, Core Data Centres, 55H, distributed by PR Newswire
Capacity
55H reports 6 MW of operating IT capacity at its Brampton facility. This is an undated operator statement, not an independently verified energization record.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Quantity type
- It
- Basis
- operator_reported_operating_IT
- Reported quantity
- 6 MW
- About Us - 55H · 55H
Permanent claim link · Claim pub-ontario_a-on-117-1
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Location
Reported55H identifies its data centre in Brampton, Ontario.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- About Us - 55H · 55H
Permanent claim link · Claim pub-ontario_a-on-117-2
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
Planned55H targets another 14 MW of IT capacity in 2026; completion is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility · 2026 expansion
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- It
- Basis
- planned additional IT capacity
- Reported quantity
- 14 MW
- About Us - 55H · 55H
Permanent claim link · Claim pub-ontario_a-on-117-3
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
MarketedThe specifications market 27 MW of utility power while describing an Alectra feed upgrade as future work. The energized amount is not disclosed.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility
- Basis
- advertised utility capacity; upgrade pending language
- Reported quantity
- 27 MW
Permanent claim link · Claim pub-ontario_a-on-117-4
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
InstalledThe listed backup design has five 1.6 MW diesel generators and ten 675 kW UPS modules, each group configured N+1. Redundant nameplates are not additive usable IT power.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
Permanent claim link · Claim pub-ontario_a-on-117-5
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-5
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
InstalledThe sheet lists N+1 CRAH units, four centrifugal chillers totaling 2,080 tons and four cooling towers; it markets liquid-cooling-dependent rack densities above 130 kW.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
Permanent claim link · Claim pub-ontario_a-on-117-6
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-6
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Ownership
Reported55H identifies Grain Management and StratCap as investors. Its March 2025 release describes Core Data Centres as its management-and-operations partner; no land-title conclusion follows.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- About Us - 55H · 55H
- 55H capacity-expansion announcement · 55H, distributed by PR Newswire
Permanent claim link · Claim pub-ontario_a-on-117-7
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-7. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-7
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Connectivity
InstalledThe specifications describe two meet-me rooms and two diverse duct banks, and name Bell, TELUS, Rogers, Beanfield, Zayo and Acronym.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
Permanent claim link · Claim pub-ontario_a-on-117-8
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-8. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-8
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Commercial
HistoricalOn March 5, 2025, 55H offered 2.5 MW for immediate lease and forecast another 2.5 MW for summer 2025 and 15 MW for first-half 2026. These dated offers and forecasts do not show current availability.
- Evidence date
- 2025-03-05
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure or relationship
- 55H capacity-expansion announcement · 55H, distributed by PR Newswire
Permanent claim link · Claim pub-ontario_a-on-117-9
Citation text (select to copy)
Clarion Solutions. 55H Brampton. Canadian Data Centre Atlas. Record on-117; claim pub-ontario_a-on-117-9. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2025-03-05; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-117/#claim-pub-ontario_a-on-117-9