CLARION Data projects

Browse this record in the Atlas

Facility · Evidence reviewed 2026-10-06

55H Brampton

55H / Core Data Centres · Brampton, Ontario

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.

Identity and map provenance

City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 5907364 · CC BY 4.0

Capacity

Operator reported operating

55H reports 6 MW of operating IT capacity at its Brampton facility. This is an undated operator statement, not an independently verified energization record.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Quantity type
It
Basis
operator_reported_operating_IT
Reported quantity
6 MW

Location

Reported

55H identifies its data centre in Brampton, Ontario.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference

Capacity

Planned

55H targets another 14 MW of IT capacity in 2026; completion is not established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility · 2026 expansion
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
It
Basis
planned additional IT capacity
Reported quantity
14 MW

Capacity

Marketed

The specifications market 27 MW of utility power while describing an Alectra feed upgrade as future work. The energized amount is not disclosed.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Utility
Basis
advertised utility capacity; upgrade pending language
Reported quantity
27 MW

Power

Installed

The listed backup design has five 1.6 MW diesel generators and ten 675 kW UPS modules, each group configured N+1. Redundant nameplates are not additive usable IT power.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration

Cooling

Installed

The sheet lists N+1 CRAH units, four centrifugal chillers totaling 2,080 tons and four cooling towers; it markets liquid-cooling-dependent rack densities above 130 kW.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope

Ownership

Reported

55H identifies Grain Management and StratCap as investors. Its March 2025 release describes Core Data Centres as its management-and-operations partner; no land-title conclusion follows.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship

Connectivity

Installed

The specifications describe two meet-me rooms and two diverse duct banks, and name Bell, TELUS, Rogers, Beanfield, Zayo and Acronym.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity infrastructure or service

Commercial

Historical

On March 5, 2025, 55H offered 2.5 MW for immediate lease and forecast another 2.5 MW for summer 2025 and 15 MW for first-half 2026. These dated offers and forecasts do not show current availability.

Evidence date
2025-03-05
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Commercial disclosure or relationship