Version-specific research record
BUZZ acquired Toronto data-centre conversion
BUZZ High Performance Computing / HIVE · Toronto, Ontario
Record on-114 · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: HIVE Digital Technologies, via SEC
- disposition: HIVE Digital Technologies, via SEC
- name: HIVE Digital Technologies, via SEC
- operator: HIVE Digital Technologies, via SEC
- province: HIVE Digital Technologies, via SEC
- record_kind: HIVE Digital Technologies, via SEC
Lifecycle
Conversion plannedHIVE announced completion of a Toronto data-centre acquisition through BUZZ on September 17, 2025, with a planned Tier 1-to-Tier 3 upgrade. AI commissioning is not established.
- Evidence date
- 2025-09-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- HIVE Toronto acquisition material-change report, SEC exhibit · HIVE Digital Technologies, via SEC
Permanent claim link · Claim pub-ontario_a-on-114-1
Citation text (select to copy)
Clarion Solutions. BUZZ acquired Toronto data-centre conversion. Canadian Data Centre Atlas. Record on-114; claim pub-ontario_a-on-114-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2025-09-17; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-114/#claim-pub-ontario_a-on-114-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
InstalledThe acquisition release describes a 7.2 MW facility. This is acquisition-stage facility capacity, not demonstrated usable AI IT load.
- Evidence date
- 2025-09-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power unspecified
- Basis
- acquisition disclosure; IT basis not established
- Reported quantity
- 7.2 MW
- HIVE Toronto acquisition material-change report, SEC exhibit · HIVE Digital Technologies, via SEC
Permanent claim link · Claim pub-ontario_a-on-114-2
Citation text (select to copy)
Clarion Solutions. BUZZ acquired Toronto data-centre conversion. Canadian Data Centre Atlas. Record on-114; claim pub-ontario_a-on-114-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2025-09-17; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-114/#claim-pub-ontario_a-on-114-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.