Project · Evidence reviewed 2026-10-06
BUZZ acquired Toronto data-centre conversion
BUZZ High Performance Computing / HIVE · Toronto, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: HIVE Digital Technologies, via SEC
- Operator: HIVE Digital Technologies, via SEC
- Province: HIVE Digital Technologies, via SEC
- City: HIVE Digital Technologies, via SEC
- Record kind: HIVE Digital Technologies, via SEC
- Disposition: HIVE Digital Technologies, via SEC
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6167865 · CC BY 4.0
Lifecycle
Conversion plannedHIVE announced completion of a Toronto data-centre acquisition through BUZZ on September 17, 2025, with a planned Tier 1-to-Tier 3 upgrade. AI commissioning is not established.
- Evidence date
- 2025-09-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- HIVE Toronto acquisition material-change report, SEC exhibit · HIVE Digital Technologies, via SEC
Capacity
InstalledThe acquisition release describes a 7.2 MW facility. This is acquisition-stage facility capacity, not demonstrated usable AI IT load.
- Evidence date
- 2025-09-17
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Facility power unspecified
- Basis
- acquisition disclosure; IT basis not established
- Reported quantity
- 7.2 MW
- HIVE Toronto acquisition material-change report, SEC exhibit · HIVE Digital Technologies, via SEC