Version-specific research record
Algoma Data Center
Red Jar Algoma Data Center Corp. · Undisclosed, Ontario
Record on-108 · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Source reuse notice: Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: Independent Electricity System Operator, Independent Electricity System Operator
- disposition: Independent Electricity System Operator, Independent Electricity System Operator
- name: Independent Electricity System Operator, Independent Electricity System Operator
- operator: Independent Electricity System Operator, Independent Electricity System Operator
- province: Independent Electricity System Operator, Independent Electricity System Operator
- record_kind: Independent Electricity System Operator, Independent Electricity System Operator
Power readiness
ActiveThe IESO table lists the Algoma Data Center connection application as Active. This is an assessment/application status, not a facility-operation or energization finding.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Utility connection application status
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
- Application Status: definitions and update date · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Permanent claim link · Claim pub-ontario_b-on-108-application_status
Citation text (select to copy)
Clarion Solutions. Algoma Data Center. Canadian Data Centre Atlas. Record on-108; claim pub-ontario_b-on-108-application_status. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-09-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-108/#claim-pub-ontario_b-on-108-application_status
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
ProposedThe application requests 400 MW of load with proposed in-service timing 2029-Q4. The value is proposed grid load, not operating IT capacity.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility supply
- Basis
- proposed connection application load
- Reported quantity
- 400 MW
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Permanent claim link · Claim pub-ontario_b-on-108-application_load
Citation text (select to copy)
Clarion Solutions. Algoma Data Center. Canadian Data Centre Atlas. Record on-108; claim pub-ontario_b-on-108-application_load. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-09-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-108/#claim-pub-ontario_b-on-108-application_load
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Location
ReportedThe registry places the application in Ontario’s Northeast transmission zone; the row does not establish a parcel or municipality.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Published location reference
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Permanent claim link · Claim pub-ontario_b-on-108-location_zone
Citation text (select to copy)
Clarion Solutions. Algoma Data Center. Canadian Data Centre Atlas. Record on-108; claim pub-ontario_b-on-108-location_zone. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-09-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-108/#claim-pub-ontario_b-on-108-location_zone
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Ownership
ReportedRed Jar Algoma Data Center Corp. is the connection applicant; the row does not establish land ownership or a commissioned facility operator.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Permanent claim link · Claim pub-ontario_b-on-108-applicant
Citation text (select to copy)
Clarion Solutions. Algoma Data Center. Canadian Data Centre Atlas. Record on-108; claim pub-ontario_b-on-108-applicant. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-09-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-108/#claim-pub-ontario_b-on-108-applicant