Project · Evidence reviewed 2026-10-06
Algoma Data Center
Red Jar Algoma Data Center Corp. · Undisclosed, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Source reuse notice: Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Independent Electricity System Operator, Independent Electricity System Operator
- Operator: Independent Electricity System Operator, Independent Electricity System Operator
- Province: Independent Electricity System Operator, Independent Electricity System Operator
- City: Independent Electricity System Operator, Independent Electricity System Operator
- Record kind: Independent Electricity System Operator, Independent Electricity System Operator
- Disposition: Independent Electricity System Operator, Independent Electricity System Operator
No unique reviewed city reference. Intentionally unpinned.
Power readiness
ActiveThe IESO table lists the Algoma Data Center connection application as Active. This is an assessment/application status, not a facility-operation or energization finding.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Utility connection application status
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
- Application Status: definitions and update date · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Capacity
ProposedThe application requests 400 MW of load with proposed in-service timing 2029-Q4. The value is proposed grid load, not operating IT capacity.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility supply
- Basis
- proposed connection application load
- Reported quantity
- 400 MW
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Location
ReportedThe registry places the application in Ontario’s Northeast transmission zone; the row does not establish a parcel or municipality.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Published location reference
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms
Ownership
ReportedRed Jar Algoma Data Center Corp. is the connection applicant; the row does not establish land ownership or a commissioned facility operator.
- Evidence date
- 2026-09-10
- Checked
- 2026-10-05
- Scope
- Connection application
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Public connection application status table · Independent Electricity System Operator
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca) Source terms