QuantumEdge secure-computing proposal

Protexxa / Missanabie Cree Business LP · Sault Ste. Marie, Ontario

Record on-107 · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Lifecycle

Proposed

The partners described QuantumEdge as an early-feasibility project in August 2026, with a conditional phased launch target of 2028–2029.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-proposal. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-proposal

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Location

Reported

The proposed cybersecurity and secure-computing centre is identified with Sault Ste. Marie, Ontario; no parcel is specified in the factsheet.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Proposed

The first phase proposes up to 5 MW of facility load, subject to technical connection review; this is not operating IT power.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility · initial phase
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Facility load
Basis
proposed initial load; no commissioning established
Reported quantity
5 MW · up_to
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-proposed_load. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-proposed_load

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Under evaluation

No cooling system had been selected; the partners were comparing low-water and closed-loop options.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-cooling_design. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-cooling_design

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

Protexxa leads planning and intended future operation, with Missanabie Cree Business LP as Indigenous development partner.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-development_roles. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-development_roles

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power readiness

Proposed

The partners report that existing PUC infrastructure could support the proposed load subject to technical review; final utility confirmation and other approvals remained prerequisites.

Evidence date
2026-08-04
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power milestone at stated scope
Citation text (select to copy)

Clarion Solutions. QuantumEdge secure-computing proposal. Canadian Data Centre Atlas. Record on-107; claim pub-ontario_b-on-107-utility_review. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-08-04; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-107/#claim-pub-ontario_b-on-107-utility_review

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.