{"city":"Sault Ste. Marie","claims":[{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-proposal","attribute":"proposal","capacity_basis":null,"capacity_type":null,"category":"lifecycle","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":true,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"proposed","status_subject":"facility_or_project_lifecycle","unit":null,"value":"The partners described QuantumEdge as an early-feasibility project in August 2026, with a conditional phased launch target of 2028–2029."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-location","attribute":"location","capacity_basis":null,"capacity_type":null,"category":"location","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"reported","status_subject":"published_location_reference","unit":null,"value":"The proposed cybersecurity and secure-computing centre is identified with Sault Ste. Marie, Ontario; no parcel is specified in the factsheet."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-proposed_load","attribute":"proposed_load","capacity_basis":"proposed initial load; no commissioning established","capacity_type":"facility_load","category":"capacity","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":5,"phase":"initial phase","qualifier":"up_to","scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"proposed","status_subject":"capacity_at_stated_basis_and_scope","unit":"MW","value":"The first phase proposes up to 5 MW of facility load, subject to technical connection review; this is not operating IT power."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-cooling_design","attribute":"cooling_design","capacity_basis":null,"capacity_type":null,"category":"cooling","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"under_evaluation","status_subject":"cooling_system_at_stated_scope","unit":null,"value":"No cooling system had been selected; the partners were comparing low-water and closed-loop options."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-development_roles","attribute":"development_roles","capacity_basis":null,"capacity_type":null,"category":"ownership","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"reported","status_subject":"ownership_operator_or_developer_relationship","unit":null,"value":"Protexxa leads planning and intended future operation, with Missanabie Cree Business LP as Indigenous development partner."},{"accessed_date":"2026-10-05","assertion_id":"pub-ontario_b-on-107-utility_review","attribute":"utility_review","capacity_basis":null,"capacity_type":null,"category":"power_readiness","claim_kind":"reported","evidence_date":"2026-08-04","evidence_date_precision":"day","facility_lifecycle_filter_eligible":false,"numeric_value":null,"phase":null,"qualifier":null,"scope":"facility","source_ids":["pub-src-ontario_b-onb-001"],"status":"proposed","status_subject":"power_milestone_at_stated_scope","unit":null,"value":"The partners report that existing PUC infrastructure could support the proposed load subject to technical review; final utility confirmation and other approvals remained prerequisites."}],"disposition":"identifiable_project","field_provenance":{"city":["pub-src-ontario_b-onb-001"],"disposition":["pub-src-ontario_b-onb-001"],"name":["pub-src-ontario_b-onb-001"],"operator":["pub-src-ontario_b-onb-001"],"province":["pub-src-ontario_b-onb-001"],"record_kind":["pub-src-ontario_b-onb-001"]},"interpretation":"Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.","name":"QuantumEdge secure-computing proposal","operator":"Protexxa / Missanabie Cree Business LP","placement":{"accessed_date":"2026-10-05","city":"Sault Ste. Marie","gazetteer_id":"6141439","gazetteer_modified_date":"2022-08-24","latitude":46.5168,"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","longitude":-84.3333,"matching_method":"Exact normalized city name and province; unique populated-place match","note":"Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location.","placement_kind":"city_reference","precision_label":"City reference only; not the facility","provenance_url":"https://www.geonames.org/6141439/","provider":"GeoNames","source_url":"https://download.geonames.org/export/dump/CA.zip"},"province":"Ontario","record_id":"on-107","record_kind":"project"}
