CLARION Data projects

Version-specific research record

BlockLAB Wabush data centre

BlockLAB · Wabush, Newfoundland and Labrador

Record nl-blocklab-wabush · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Lifecycle

Historical

North Star Associates describes engineering, construction management and commissioning for BlockLAB’s Wabush project during 2018–2020.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. BlockLAB Wabush data centre. Canadian Data Centre Atlas. Record nl-blocklab-wabush; claim pub-quebec-east-nl-blocklab-wabush-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nl-blocklab-wabush/#claim-pub-quebec-east-nl-blocklab-wabush-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Historical

The contractor describes the Wabush site as 20 MW.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Reported capacity
Quantity type
Unspecified
Basis
contractor-reported design-build rating; gross-versus-IT basis not stated
Reported quantity
20 MW
Citation text (select to copy)

Clarion Solutions. BlockLAB Wabush data centre. Canadian Data Centre Atlas. Record nl-blocklab-wabush; claim pub-quebec-east-nl-blocklab-wabush-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nl-blocklab-wabush/#claim-pub-quebec-east-nl-blocklab-wabush-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Historical

The contractor describes Labrador hydroelectric generation as a project advantage; no exclusive physical supply or site-specific utility contract is established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power configuration
Citation text (select to copy)

Clarion Solutions. BlockLAB Wabush data centre. Canadian Data Centre Atlas. Record nl-blocklab-wabush; claim pub-quebec-east-nl-blocklab-wabush-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/nl-blocklab-wabush/#claim-pub-quebec-east-nl-blocklab-wabush-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.