Version-specific research record
Keel Sherbrooke consolidated data-centre proposal
Keel Infrastructure · Sherbrooke, Quebec
Record QC-KEEL-SHERBROOKE-NEW · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: Keel Infrastructure, Keel Infrastructure
- disposition: Keel Infrastructure, Keel Infrastructure
- name: Keel Infrastructure, Keel Infrastructure
- operator: Keel Infrastructure, Keel Infrastructure
- province: Keel Infrastructure, Keel Infrastructure
- record_kind: Keel Infrastructure, Keel Infrastructure
Lifecycle
ProposedKeel’s July 2026 announcement proposes consolidating three Sherbrooke installations into a new data centre, subject to approvals and further studies.
- Evidence date
- 2026-07-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Keel Infrastructure Advances Sherbrooke, Québec Data Center Project | 07.15.26 · Keel Infrastructure
Permanent claim link · Claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-1
Citation text (select to copy)
Clarion Solutions. Keel Sherbrooke consolidated data-centre proposal. Canadian Data Centre Atlas. Record QC-KEEL-SHERBROOKE-NEW; claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-07-15; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/QC-KEEL-SHERBROOKE-NEW/#claim-pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
Conditional planThe proposal would transfer the existing three-site 96 MW allocation to the new campus, conditional on required agreements and approvals.
- Evidence date
- 2026-07-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Utility supply
- Basis
- transfer of existing allocation; not new incremental or energized AI capacity
- Reported quantity
- 96 MW
- Keel Infrastructure Advances Sherbrooke, Québec Data Center Project | 07.15.26 · Keel Infrastructure
Permanent claim link · Claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-2
Citation text (select to copy)
Clarion Solutions. Keel Sherbrooke consolidated data-centre proposal. Canadian Data Centre Atlas. Record QC-KEEL-SHERBROOKE-NEW; claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2026-07-15; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/QC-KEEL-SHERBROOKE-NEW/#claim-pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
PlannedKeel’s project page proposes closed-loop distilled-water/glycol cooling, with the initial fill delivered by tanker.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- Le projet de centre de données à Sherbrooke - Keel Infrastructure · Keel Infrastructure
Permanent claim link · Claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-3
Citation text (select to copy)
Clarion Solutions. Keel Sherbrooke consolidated data-centre proposal. Canadian Data Centre Atlas. Record QC-KEEL-SHERBROOKE-NEW; claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/QC-KEEL-SHERBROOKE-NEW/#claim-pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
PlannedThe project page envisages generators for backup and winter grid support, with up to 200 winter hours discussed; equipment decisions remain subject to studies.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power configuration
- Le projet de centre de données à Sherbrooke - Keel Infrastructure · Keel Infrastructure
Permanent claim link · Claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-4
Citation text (select to copy)
Clarion Solutions. Keel Sherbrooke consolidated data-centre proposal. Canadian Data Centre Atlas. Record QC-KEEL-SHERBROOKE-NEW; claim pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/QC-KEEL-SHERBROOKE-NEW/#claim-pub-quebec-east-QC-KEEL-SHERBROOKE-NEW-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.