Project · Evidence reviewed 2026-10-06
Keel Sherbrooke consolidated data-centre proposal
Keel Infrastructure · Sherbrooke, Quebec
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Keel Infrastructure, Keel Infrastructure
- Operator: Keel Infrastructure, Keel Infrastructure
- Province: Keel Infrastructure, Keel Infrastructure
- City: Keel Infrastructure, Keel Infrastructure
- Record kind: Keel Infrastructure, Keel Infrastructure
- Disposition: Keel Infrastructure, Keel Infrastructure
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6146143 · CC BY 4.0
Lifecycle
ProposedKeel’s July 2026 announcement proposes consolidating three Sherbrooke installations into a new data centre, subject to approvals and further studies.
- Evidence date
- 2026-07-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Keel Infrastructure Advances Sherbrooke, Québec Data Center Project | 07.15.26 · Keel Infrastructure
Capacity
Conditional planThe proposal would transfer the existing three-site 96 MW allocation to the new campus, conditional on required agreements and approvals.
- Evidence date
- 2026-07-15
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Utility supply
- Basis
- transfer of existing allocation; not new incremental or energized AI capacity
- Reported quantity
- 96 MW
- Keel Infrastructure Advances Sherbrooke, Québec Data Center Project | 07.15.26 · Keel Infrastructure
Cooling
PlannedKeel’s project page proposes closed-loop distilled-water/glycol cooling, with the initial fill delivered by tanker.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- Le projet de centre de données à Sherbrooke - Keel Infrastructure · Keel Infrastructure
Power
PlannedThe project page envisages generators for backup and winter grid support, with up to 200 winter hours discussed; equipment decisions remain subject to studies.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power configuration
- Le projet de centre de données à Sherbrooke - Keel Infrastructure · Keel Infrastructure