Project · Evidence reviewed 2026-10-06
BUZZ HPC 320 MW AI gigafactory
BUZZ High Performance Computing / HIVE · Greater Toronto Area, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: HIVE Digital Technologies, via SEC
- Operator: HIVE Digital Technologies, via SEC
- Province: HIVE Digital Technologies, via SEC
- City: HIVE Digital Technologies, via SEC
- Record kind: HIVE Digital Technologies, via SEC
- Disposition: HIVE Digital Technologies, via SEC
No unique reviewed city reference. Intentionally unpinned.
Lifecycle
PlannedHIVE’s May 2026 announcement targets second-half 2027 for the planned Greater Toronto Area AI campus.
- Evidence date
- 2026-05-18
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- HIVE/BUZZ 320 MW GTA project announcement, SEC exhibit · HIVE Digital Technologies, via SEC
Capacity
PlannedThe issuer reports a 320 MW utility-power allocation for the acquired site. The filing does not provide an executed utility agreement or establish energized IT capacity.
- Evidence date
- 2026-05-18
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility
- Basis
- issuer-reported allocation; unverified energization
- Reported quantity
- 320 MW
- HIVE/BUZZ 320 MW GTA project announcement, SEC exhibit · HIVE Digital Technologies, via SEC
Cooling
PlannedThe design calls for Ontario-grid electricity and closed-loop cooling with a no-water-use approach; these are project intentions, not installed-system evidence.
- Evidence date
- 2026-05-18
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- HIVE/BUZZ 320 MW GTA project announcement, SEC exhibit · HIVE Digital Technologies, via SEC
Hardware
PlannedThe full-buildout design targets more than 100,000 GPUs; models, procurement and installed inventory are not established.
- Evidence date
- 2026-05-18
- Checked
- 2026-10-05
- Scope
- Campus
- Evidence type
- Reported
- Status describes
- Hardware deployment procurement or support
- HIVE/BUZZ 320 MW GTA project announcement, SEC exhibit · HIVE Digital Technologies, via SEC
Ownership
ReportedHIVE states that its BUZZ subsidiary acquired adjoining parcels of approximately 21 and 4 acres.
- Evidence date
- 2026-05-18
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- HIVE/BUZZ 320 MW GTA project announcement, SEC exhibit · HIVE Digital Technologies, via SEC