Facility · Evidence reviewed 2026-10-06
WhiteFiber / Enovum MTL-3
WhiteFiber / Enovum Data Centers · Saint-Jérôme, Quebec
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: WhiteFiber, Inc.
- Operator: WhiteFiber, Inc.
- Province: WhiteFiber, Inc.
- City: WhiteFiber, Inc.
- Record kind: WhiteFiber, Inc.
- Disposition: WhiteFiber, Inc.
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6138501 · CC BY 4.0
Lifecycle
The August 2026 filing states that MTL-3 became operational in November 2025; WhiteFiber acquired the Saint-Jérôme property in May 2026.
- Evidence date
- 2026-08-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- wyfi-20260630 · WhiteFiber, Inc.
Capacity
ReportedThe filing describes MTL-3 as 7 MW gross.
- Evidence date
- 2026-08-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Facility power
- Basis
- gross facility rating; not equivalent to IT load or measured demand
- Reported quantity
- 7 MW
- wyfi-20260630 · WhiteFiber, Inc.
Capacity
ReportedMTL-3’s Cerebras contract is for 5 MW IT load, within its 7 MW gross design.
- Evidence date
- 2026-08-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- It load
- Basis
- tenant-contracted IT capacity, not incremental to gross facility power
- Reported quantity
- 5 MW
- wyfi-20260630 · WhiteFiber, Inc.
Cooling
ReportedWhiteFiber’s MTL-3 page describes direct-to-chip liquid cooling, N+1 systems and carrier-neutral connectivity; exact physical route diversity is not independently established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- MTL-3 | WhiteFiber · WhiteFiber
Commercial
ReportedThe filing states Cerebras billing began November 1, 2025 at C$1.4 million monthly under a five-year contract; this is tenant-specific, not market pricing.
- Evidence date
- 2026-08-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Commercial disclosure
- wyfi-20260630 · WhiteFiber, Inc.