Version-specific research record
Columbia Data Vault
Columbia Data Vault · Waterloo, Ontario
Record on-061 · 2026-10-06-83c11c799ab4-public-2026-10-07
Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- name: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
- operator: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
- province: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
- city: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
- record_kind: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
- disposition: Columbia Data Vault, distributed by CNW, Columbia Data Vault, Columbia Data Vault
Lifecycle
Announced openColumbia Data Vault announced the opening of its Waterloo facility in October 2023, saying it had assumed control of the former BlackBerry RIM10 data centre. Registered title is not established.
- Evidence date
- 2023-10-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Columbia Data Vault Waterloo opening announcement · Columbia Data Vault, distributed by CNW
Permanent claim link · Claim pub-ontario_a-on-061-1
Citation text (select to copy)
Clarion Solutions. Columbia Data Vault. Canadian Data Centre Atlas. Record on-061; claim pub-ontario_a-on-061-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2023-10-12; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-061/#claim-pub-ontario_a-on-061-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Location
ReportedThe operator identifies the Columbia Data Vault project in Waterloo, Ontario.
- Evidence date
- 2023-10-12
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Columbia Data Vault Waterloo opening announcement · Columbia Data Vault, distributed by CNW
Permanent claim link · Claim pub-ontario_a-on-061-2
Citation text (select to copy)
Clarion Solutions. Columbia Data Vault. Canadian Data Centre Atlas. Record on-061; claim pub-ontario_a-on-061-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2023-10-12; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-061/#claim-pub-ontario_a-on-061-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
MarketedThe operator-branded sheet (whose filename includes February 2024) advertises up to 60 MW of utility power. This is an upper-bound offer, not verified energized or usable IT load.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Utility
- Basis
- advertised upper bound
- Reported quantity
- 60 MW · The filename contains Feb-2024; publication date is unconfirmed.
- Columbia Data Vault Waterloo technical specifications · Columbia Data Vault
Permanent claim link · Claim pub-ontario_a-on-061-3
Citation text (select to copy)
Clarion Solutions. Columbia Data Vault. Canadian Data Centre Atlas. Record on-061; claim pub-ontario_a-on-061-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-061/#claim-pub-ontario_a-on-061-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
InstalledThe sheet names Waterloo North Hydro and North Waterloo substation, active/active feeds, N+1 UPS and diesel-generator pods with 48-hour fuel runtime.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Columbia Data Vault Waterloo technical specifications · Columbia Data Vault
Permanent claim link · Claim pub-ontario_a-on-061-4
Citation text (select to copy)
Clarion Solutions. Columbia Data Vault. Canadian Data Centre Atlas. Record on-061; claim pub-ontario_a-on-061-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-061/#claim-pub-ontario_a-on-061-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
MarketedIt markets N+1 air and liquid cooling; installed liquid-cooling extent is not separately established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- Columbia Data Vault Waterloo technical specifications · Columbia Data Vault
Permanent claim link · Claim pub-ontario_a-on-061-5
Citation text (select to copy)
Clarion Solutions. Columbia Data Vault. Canadian Data Centre Atlas. Record on-061; claim pub-ontario_a-on-061-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-061/#claim-pub-ontario_a-on-061-5
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.