CLARION Data projects

Version-specific research record

Centrilogic Greater Toronto / Tranmere

Centrilogic · Mississauga, Ontario

Record on-043 · 2026-10-06-83c11c799ab4-public-2026-10-07

Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Centrilogic markets its Greater Toronto / Tranmere data centre in Mississauga, Ontario at 7445 Tranmere Drive. The page establishes an offering, not a new commissioning date.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Operator marketed facility identity
Citation text (select to copy)

Clarion Solutions. Centrilogic Greater Toronto / Tranmere. Canadian Data Centre Atlas. Record on-043; claim pub-ontario_a-on-043-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-043/#claim-pub-ontario_a-on-043-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Installed

The technical page lists diverse utility feeds, two 500 kW UPS systems and two diesel generators. The UPS ratings are not summed into usable IT capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Centrilogic Greater Toronto / Tranmere. Canadian Data Centre Atlas. Record on-043; claim pub-ontario_a-on-043-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-043/#claim-pub-ontario_a-on-043-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Installed

Centrilogic specifies redundant chillers and dry-cooling units with CRAC humidity control.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. Centrilogic Greater Toronto / Tranmere. Canadian Data Centre Atlas. Record on-043; claim pub-ontario_a-on-043-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-043/#claim-pub-ontario_a-on-043-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Connectivity

Installed

The page describes multiple Tier 1 providers on divergent paths and inter-facility connectivity; routes are not independently audited.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Connectivity infrastructure or service
Citation text (select to copy)

Clarion Solutions. Centrilogic Greater Toronto / Tranmere. Canadian Data Centre Atlas. Record on-043; claim pub-ontario_a-on-043-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-043/#claim-pub-ontario_a-on-043-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.