Version-specific research record
Serverfarm TOR1
Serverfarm · Toronto, Ontario
Record on-029 · 2026-10-06-83c11c799ab4-public-2026-10-07
Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- name: Serverfarm
- operator: Serverfarm
- province: Serverfarm
- city: Serverfarm
- record_kind: Serverfarm
- disposition: Serverfarm
Location
ReportedServerfarm identifies TOR1 as its Toronto data centre, near the Highway 400 / 401 area.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- TOR1 Toronto data centre · Serverfarm
- SF TOR1 summary data sheet · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-location
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-location
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Commercial
ReportedServerfarm advertises Toronto data-centre and managed-infrastructure services at TOR1.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Marketed service
- TOR1 Toronto data centre · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-service
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-service. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-service
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
ReportedServerfarm advertises 14 MW of IT capacity capability at TOR1; available headroom and metered load are not specified.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- It capacity
- Basis
- operator-advertised capacity capability, not measured use
- Reported quantity
- 14 MW
- TOR1 Toronto data centre · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-it_capability
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-it_capability. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-it_capability
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
ReportedThe operator separately lists 21 MVA of utility capacity; it is not converted to MW.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Reported quantity
- 21 MVA
- TOR1 Toronto data centre · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-utility_rating
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-utility_rating. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-utility_rating
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
ReportedServerfarm lists a central air-cooled cooling plant with integral waterside economizers.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- TOR1 Toronto data centre · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-cooling
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-cooling. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-cooling
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Ownership
ReportedServerfarm markets and describes TOR1 as its Toronto data-centre asset.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- TOR1 Toronto data centre · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-operator
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-operator. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-operator
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Connectivity
ReportedThe TOR1 sheet names Zayo and Beanfield connectivity and two meet-me rooms; it does not establish a full end-to-end route audit.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity at stated scope
- SF TOR1 summary data sheet · Serverfarm
Permanent claim link · Claim pub-ontario_b-on-029-connectivity
Citation text (select to copy)
Clarion Solutions. Serverfarm TOR1. Canadian Data Centre Atlas. Record on-029; claim pub-ontario_b-on-029-connectivity. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/on-029/#claim-pub-ontario_b-on-029-connectivity
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.