Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Terrace, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Early development

Skeena describes an early-stage campus development with feasibility, land, power, design and finance work still underway.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

The long-term ambition is up to 300 MW in phases. It is not utility-approved capacity or operating load.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Campus total
Basis
ultimate_buildout
Reported quantity
300 MW · Separate source-reported quantities are not additive.
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Planned

Options under study include gas generation, later BC Hydro access, geothermal and battery storage. The final mix depends on studies, permissions and agreements.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Planned

Shared closed-loop cooling is part of the campus concept, without evidence of an installed plant.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Commercial

Marketed

The developer markets independently owned private centres starting at 5 MW, with shared infrastructure. No signed tenant or committed vacancy figure is established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Campus
Evidence type
Reported
Status describes
Commercial disclosure or relationship
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-6

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies Skeena Data Centers in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Skeena Data Centers campus. Canadian Data Centre Atlas. Record bc-skeena-terrace; claim pub-bc-skeena-terrace-review-7. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-skeena-terrace/#claim-pub-bc-skeena-terrace-review-7

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.