CLARION Data projects

Version-specific research record

CanHost data centre

CanHost · Kelowna, British Columbia

Record bc-canhost · 2026-10-06-83c11c799ab4-public-2026-10-07

Current selected data edition. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-07.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Kelowna, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Marketed

CanHost advertises colocation in its own Kelowna facility.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published identity or service listing
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Operating

CanHost lists a dedicated 1 MW hydroelectric feed. This is an incoming-supply claim, not a measured or net IT-load figure.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Utility supply
Basis
operating_nameplate
Reported quantity
1 MW · Separate source-reported quantities are not additive.
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Operating

The operator identifies UPS support and a standby natural-gas generator backing the utility feed.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Operating

CanHost describes monitored air-conditioning and temperature control without a more detailed plant specification.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies CanHost in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. CanHost data centre. Canadian Data Centre Atlas. Record bc-canhost; claim pub-bc-canhost-review-6. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/bc-canhost/#claim-pub-bc-canhost-review-6

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.