Identity provenance
- name: Teton Digital
- operator: Teton Digital
- province: Teton Digital
- city: Teton Digital
- record_kind: Teton Digital
- disposition: Teton Digital
Location
ReportedAlberta (municipality unverified), Alberta. City or regional reference only; no facility coordinates are published.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Black Bear — Teton Digital, LLC · Teton Digital
Permanent claim link · Claim pub-ab-teton-black-bear-review-1
Citation text (select to copy)
Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Lifecycle
ProposedTeton markets a Black Bear gas-to-compute development and a future energization pathway. The sponsor’s permitted-power description does not establish an operating data-centre campus.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Black Bear — Teton Digital, LLC · Teton Digital
Permanent claim link · Claim pub-ab-teton-black-bear-review-2
Citation text (select to copy)
Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedTeton describes a 466 MW gas plant and a potential approximately 3 GW campus pathway, split roughly between 2 GW behind the meter and 1 GW grid-connected. These are future power quantities, not committed or live IT load.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Generation
- Basis
- proposed
- Black Bear — Teton Digital, LLC · Teton Digital
Permanent claim link · Claim pub-ab-teton-black-bear-review-3
Citation text (select to copy)
Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
PlannedThe concept uses natural-gas combined-cycle generation and a possible earlier grid bridge. An authorized, energized bridge load is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
- Black Bear — Teton Digital, LLC · Teton Digital
Permanent claim link · Claim pub-ab-teton-black-bear-review-4
Citation text (select to copy)
Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Ownership
ReportedThe reviewed source identifies Teton Digital in the operator or development role. This does not establish title to the underlying land.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Ownership operator or developer relationship
- Black Bear — Teton Digital, LLC · Teton Digital
Permanent claim link · Claim pub-ab-teton-black-bear-review-5
Citation text (select to copy)
Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-5
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.