Identity provenance
Lifecycle
AnnouncedHypertec, 5C and Mila announced a planned AI research hub at Hypertec’s LaSalle campus in September 2025.
- Evidence date
- 2025-09-25
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
Permanent claim link · Claim pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-1
Citation text (select to copy)
Clarion Solutions. Hypertec / 5C / Mila LaSalle AI research hub proposal. Canadian Data Centre Atlas. Record QC-HYPERTEC-MILA-LASALLE; claim pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2025-09-25; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/QC-HYPERTEC-MILA-LASALLE/#claim-pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedThe proposed research hub is described as up to 3 MW of AI infrastructure; the power boundary is unspecified.
- Evidence date
- 2025-09-25
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Reported capacity
- Quantity type
- Unspecified
- Basis
- announced infrastructure ceiling; not verified commissioned IT capacity
- Reported quantity
- 3 MW · up to
Permanent claim link · Claim pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-2
Citation text (select to copy)
Clarion Solutions. Hypertec / 5C / Mila LaSalle AI research hub proposal. Canadian Data Centre Atlas. Record QC-HYPERTEC-MILA-LASALLE; claim pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-07 (publication date: 2026-10-07); evidence review through 2026-10-06. Claim evidence date: 2025-09-25; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-07/records/QC-HYPERTEC-MILA-LASALLE/#claim-pub-quebec-east-QC-HYPERTEC-MILA-LASALLE-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.