TELUS Laird switching-centre project

TELUS · Toronto, Ontario

Record on-175 · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Telstorm locates its TELUS master-switching-centre project on Laird Avenue in Toronto, Ontario.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. TELUS Laird switching-centre project. Canadian Data Centre Atlas. Record on-175; claim pub-ontario_b-on-175-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-175/#claim-pub-ontario_b-on-175-location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Development

Historical

Telstorm describes designing an 8,000-square-foot master switching centre for TELUS; the account does not date present operation.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Project milestone at stated scope
Citation text (select to copy)

Clarion Solutions. TELUS Laird switching-centre project. Canadian Data Centre Atlas. Record on-175; claim pub-ontario_b-on-175-engineering_scope. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-175/#claim-pub-ontario_b-on-175-engineering_scope

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Historical design

The scoped fitout design included three 30-ton CRAC units, rather than a whole-building current cooling inventory.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. TELUS Laird switching-centre project. Canadian Data Centre Atlas. Record on-175; claim pub-ontario_b-on-175-cooling. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-175/#claim-pub-ontario_b-on-175-cooling

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The engineer names TELUS as client; the account does not establish current building title.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. TELUS Laird switching-centre project. Canadian Data Centre Atlas. Record on-175; claim pub-ontario_b-on-175-client. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-175/#claim-pub-ontario_b-on-175-client

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.