Version-specific research record
Qu LDN1
Qu Data Centres · London, Ontario
Record on-053 · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: Qu Data Centres
- disposition: Qu Data Centres
- name: Qu Data Centres
- operator: Qu Data Centres
- province: Qu Data Centres
- record_kind: Qu Data Centres
Location
ReportedLondon, Ontario.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Published location reference
- Qu London facility page · Qu Data Centres
Permanent claim link · Claim pub-expand-on-053-public_location
Citation text (select to copy)
Clarion Solutions. Qu LDN1. Canadian Data Centre Atlas. Record on-053; claim pub-expand-on-053-public_location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-053/#claim-pub-expand-on-053-public_location
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Lifecycle
Qu states that it operates LDN1.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Facility or project lifecycle
- Qu London facility page · Qu Data Centres
Permanent claim link · Claim pub-expand-on-053-facility_status
Citation text (select to copy)
Clarion Solutions. Qu LDN1. Canadian Data Centre Atlas. Record on-053; claim pub-expand-on-053-facility_status. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-053/#claim-pub-expand-on-053-facility_status
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
ReportedQu reports 5 MW of current utility power.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity assertion
- Quantity type
- Utility supply
- Basis
- operator-described current utility supply; not IT load
- Reported quantity
- 5 MW
- Qu London facility page · Qu Data Centres
Permanent claim link · Claim pub-expand-on-053-advertised_power
Citation text (select to copy)
Clarion Solutions. Qu LDN1. Canadian Data Centre Atlas. Record on-053; claim pub-expand-on-053-advertised_power. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-053/#claim-pub-expand-on-053-advertised_power
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Capacity
PlannedQu describes an upgrade path to 20 MW of utility capacity; this is not reported as existing commissioned capacity.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity assertion
- Quantity type
- Utility supply
- Basis
- upgradeable utility capacity; not present capacity or IT load
- Reported quantity
- 20 MW · upgradeable ceiling
- Qu London facility page · Qu Data Centres
Permanent claim link · Claim pub-expand-on-053-upgradeable_utility_power
Citation text (select to copy)
Clarion Solutions. Qu LDN1. Canadian Data Centre Atlas. Record on-053; claim pub-expand-on-053-upgradeable_utility_power. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-053/#claim-pub-expand-on-053-upgradeable_utility_power
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
ReportedQu lists 580 tons of cooling with N+2 redundancy.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling configuration
- Reported quantity
- 580 ton_refrigeration
- Qu London facility page · Qu Data Centres
Permanent claim link · Claim pub-expand-on-053-cooling_configuration
Citation text (select to copy)
Clarion Solutions. Qu LDN1. Canadian Data Centre Atlas. Record on-053; claim pub-expand-on-053-cooling_configuration. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-053/#claim-pub-expand-on-053-cooling_configuration
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.