Version-specific research record
Centrilogic Mississauga South
Centrilogic · Mississauga, Ontario
Record on-041 · 2026-10-06-83c11c799ab4-public-2026-10-06
Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.
Current record profile · This edition’s record JSON · Edition overview
Identity provenance
- city: Centrilogic, Centrilogic
- disposition: Centrilogic, Centrilogic
- name: Centrilogic, Centrilogic
- operator: Centrilogic, Centrilogic
- province: Centrilogic, Centrilogic
- record_kind: Centrilogic, Centrilogic
Location
ReportedCentrilogic markets its Mississauga South data centre in Mississauga, Ontario at 2 Robert Speck Parkway, Suite 500. The page establishes an offering, not a new commissioning date.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Operator marketed facility identity
- Mississauga, Ontario (Canadian Head Office) | Centrilogic · Centrilogic
- Mississauga, Ontario (Canadian Head Office) | Centrilogic · Centrilogic
Permanent claim link · Claim pub-ontario_a-on-041-1
Citation text (select to copy)
Clarion Solutions. Centrilogic Mississauga South. Canadian Data Centre Atlas. Record on-041; claim pub-ontario_a-on-041-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-041/#claim-pub-ontario_a-on-041-1
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Power
InstalledThe operator describes diverse utility feeds from separate grids, A/B distribution, N+1 UPS and diesel backup.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
Permanent claim link · Claim pub-ontario_a-on-041-2
Citation text (select to copy)
Clarion Solutions. Centrilogic Mississauga South. Canadian Data Centre Atlas. Record on-041; claim pub-ontario_a-on-041-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-041/#claim-pub-ontario_a-on-041-2
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Connectivity
InstalledThe page lists multiple backbone providers and inter-facility connectivity; current physical-route independence is not verified.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Connectivity infrastructure or service
Permanent claim link · Claim pub-ontario_a-on-041-3
Citation text (select to copy)
Clarion Solutions. Centrilogic Mississauga South. Canadian Data Centre Atlas. Record on-041; claim pub-ontario_a-on-041-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-041/#claim-pub-ontario_a-on-041-3
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.
Cooling
InstalledThe technical page specifies N+1 independent cooling units with hot/cold aisles.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
Permanent claim link · Claim pub-ontario_a-on-041-4
Citation text (select to copy)
Clarion Solutions. Centrilogic Mississauga South. Canadian Data Centre Atlas. Record on-041; claim pub-ontario_a-on-041-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-041/#claim-pub-ontario_a-on-041-4
Cite the linked primary evidence as well. Publication and access dates do not establish current operations.