CLARION Data projects

Version-specific research record

Urbacon Toronto DC5

Urbacon Data Centre Solutions · Richmond Hill, Ontario

Record on-034 · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

UDCS locates DC5 at Barker Business Park in Richmond Hill, Ontario; no street number is assigned.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-location. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-location

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

In development

UDCS’s undated available-sites page describes DC5 as in development.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-project_status. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-project_status

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

UDCS advertises up to 65 MW of critical IT/design power for DC5, not commissioned IT capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
It design capacity
Basis
operator-advertised design/planned critical IT capacity
Reported quantity
65 MW · up_to
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-critical_design. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-critical_design

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Reported

UDCS says 80 MW of total power is secured for DC5. This is not an independently verified utility commitment or usable-IT figure.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Utility supply
Basis
operator-reported total power secured
Reported quantity
80 MW
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-secured_power_claim. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-secured_power_claim

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

Planned

UDCS advertises free-air, liquid-cooled and hybrid design options; the final commissioned cooling system is not established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-cooling_options. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-cooling_options

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

Urbacon Data Centre Solutions markets and develops the project; the legal titleholding entity is not named.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-developer. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-developer

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power readiness

Reported

UDCS reports zoning approval and power secured for DC5; the page does not state energization or IT commissioning.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power milestone at stated scope
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-readiness. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-readiness

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Commercial

Reported

The operator markets DC5 for lease; no specific executed customer lease or vacant MW is disclosed.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Marketed service
Citation text (select to copy)

Clarion Solutions. Urbacon Toronto DC5. Canadian Data Centre Atlas. Record on-034; claim pub-ontario_b-on-034-marketing. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/on-034/#claim-pub-ontario_b-on-034-marketing

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.