CLARION Data projects

Version-specific research record

Grex high-performance computing system

University of Manitoba HPC team · Winnipeg, Manitoba

Record mb-grex-system · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Documented

The University of Manitoba HPC team’s public documentation identifies Grex as its computing system; the team’s profile locates it in Winnipeg, Manitoba. This is a system record, not a mapped data-hall building.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hpc system identity
Citation text (select to copy)

Clarion Solutions. Grex high-performance computing system. Canadian Data Centre Atlas. Record mb-grex-system; claim pub-ontario_a-mb-grex-system-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/mb-grex-system/#claim-pub-ontario_a-mb-grex-system-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Cooling

System migration completed

The Grex team’s migration log describes new water-cooled rack infrastructure in August–September 2024 and reports the system fully online on September 10. It does not specify direct-to-chip versus rear-door cooling.

Evidence date
2024-09-10
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Cooling system at stated scope
Citation text (select to copy)

Clarion Solutions. Grex high-performance computing system. Canadian Data Centre Atlas. Record mb-grex-system; claim pub-ontario_a-mb-grex-system-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2024-09-10; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/mb-grex-system/#claim-pub-ontario_a-mb-grex-system-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Hardware

Documented inventory

Both technical tables describe V100-equipped groups: two nodes with four 32 GB GPUs each, three contributed nodes with four 16 GB GPUs each, and one contributed node with sixteen 32 GB GPUs. This is documented configuration, not an independent hardware audit.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hardware deployment procurement or support
Citation text (select to copy)

Clarion Solutions. Grex high-performance computing system. Canadian Data Centre Atlas. Record mb-grex-system; claim pub-ontario_a-mb-grex-system-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/mb-grex-system/#claim-pub-ontario_a-mb-grex-system-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Hardware

Conflicting documentation

Grex’s hardware page lists two groups of two A30 nodes with two GPUs per node; the partition page instead lists four A30 GPUs per node for one contributed group. The documents conflict, so no single A30 total is published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hardware deployment procurement or support
Citation text (select to copy)

Clarion Solutions. Grex high-performance computing system. Canadian Data Centre Atlas. Record mb-grex-system; claim pub-ontario_a-mb-grex-system-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/mb-grex-system/#claim-pub-ontario_a-mb-grex-system-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Hardware

Conflicting documentation

The hardware table lists one two-GPU L40S node, while its narrative and the partition table indicate two such nodes. The documents conflict; no single installed L40S total is established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Hardware deployment procurement or support
Citation text (select to copy)

Clarion Solutions. Grex high-performance computing system. Canadian Data Centre Atlas. Record mb-grex-system; claim pub-ontario_a-mb-grex-system-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/mb-grex-system/#claim-pub-ontario_a-mb-grex-system-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.