CLARION Data projects

Version-specific research record

Equinix KA1

Equinix · Kamloops, British Columbia

Record bc-equinix-ka1 · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Kamloops, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Equinix KA1. Canadian Data Centre Atlas. Record bc-equinix-ka1; claim pub-bc-equinix-ka1-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-equinix-ka1/#claim-pub-bc-equinix-ka1-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Reported

EllisDon reports completing a KA1 data-hall fit-out and live-facility UPS work in Kamloops. This is contractor-reported project evidence, not a current full-facility audit.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published identity or service listing
Citation text (select to copy)

Clarion Solutions. Equinix KA1. Canadian Data Centre Atlas. Record bc-equinix-ka1; claim pub-bc-equinix-ka1-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-equinix-ka1/#claim-pub-bc-equinix-ka1-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Operating

The contractor says it replaced nine 500 kW UPS units with six 750 kW units without interrupting the critical load. Equipment ratings do not establish facility IT capacity.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Equinix KA1. Canadian Data Centre Atlas. Record bc-equinix-ka1; claim pub-bc-equinix-ka1-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-equinix-ka1/#claim-pub-bc-equinix-ka1-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies Equinix in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Equinix KA1. Canadian Data Centre Atlas. Record bc-equinix-ka1; claim pub-bc-equinix-ka1-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-equinix-ka1/#claim-pub-bc-equinix-ka1-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.