CLARION Data projects

Version-specific research record

Bell AI Fabric Mission Flats

Bell Canada / TrueNorth Sustainable Infrastructure · Kamloops, British Columbia

Record bc-bell-mission · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Kamloops, British Columbia. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Bell AI Fabric Mission Flats. Canadian Data Centre Atlas. Record bc-bell-mission; claim pub-bc-bell-mission-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-bell-mission/#claim-pub-bc-bell-mission-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Operating

TrueNorth identifies Mission Flats as operating and dates commissioning to June 2025.

Evidence date
2025-06
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. Bell AI Fabric Mission Flats. Canadian Data Centre Atlas. Record bc-bell-mission; claim pub-bc-bell-mission-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2025-06; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-bell-mission/#claim-pub-bc-bell-mission-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Reported

TrueNorth lists 6.5 MW as current Mission Flats capacity and 20 MW as expected power delivery. The upgrade timing and IT-load boundary are not disclosed; these quantities are not additive.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Unspecified
Basis
operating_nameplate
Citation text (select to copy)

Clarion Solutions. Bell AI Fabric Mission Flats. Canadian Data Centre Atlas. Record bc-bell-mission; claim pub-bc-bell-mission-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-bell-mission/#claim-pub-bc-bell-mission-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Leased

The transaction lawyer reports a lease by TrueNorth to Bell completed on 1 February 2025. A lease does not establish Bell’s ownership of the building.

Evidence date
2025-02-01
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Bell AI Fabric Mission Flats. Canadian Data Centre Atlas. Record bc-bell-mission; claim pub-bc-bell-mission-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: 2025-02-01; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-bell-mission/#claim-pub-bc-bell-mission-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies Bell Canada / TrueNorth Sustainable Infrastructure in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Bell AI Fabric Mission Flats. Canadian Data Centre Atlas. Record bc-bell-mission; claim pub-bc-bell-mission-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/bc-bell-mission/#claim-pub-bc-bell-mission-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.