CLARION Data projects

Version-specific research record

Teton Black Bear compute campus

Teton Digital · Alberta (municipality unverified), Alberta

Record ab-teton-black-bear · 2026-10-06-83c11c799ab4-public-2026-10-06

Historical published edition. Do not treat these as newer or additional facts. Evidence reviewed through 2026-10-06. Edition publication date: 2026-10-06.

Research record, not a building count. Campus and phase overlap may exist; do not add capacity values.

Current record profile · This edition’s record JSON · Edition overview

Identity provenance

Location

Reported

Alberta (municipality unverified), Alberta. City or regional reference only; no facility coordinates are published.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Published location reference
Citation text (select to copy)

Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-1. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-1

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Lifecycle

Proposed

Teton markets a Black Bear gas-to-compute development and a future energization pathway. The sponsor’s permitted-power description does not establish an operating data-centre campus.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Facility or project lifecycle
Citation text (select to copy)

Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-2. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-2

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Capacity

Planned

Teton describes a 466 MW gas plant and a potential approximately 3 GW campus pathway, split roughly between 2 GW behind the meter and 1 GW grid-connected. These are future power quantities, not committed or live IT load.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Capacity at stated basis and scope
Quantity type
Generation
Basis
proposed
Citation text (select to copy)

Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-3. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-3

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Power

Planned

The concept uses natural-gas combined-cycle generation and a possible earlier grid bridge. An authorized, energized bridge load is not established.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Power supply or backup configuration
Citation text (select to copy)

Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-4. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-4

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.

Ownership

Reported

The reviewed source identifies Teton Digital in the operator or development role. This does not establish title to the underlying land.

Evidence date
Undated source
Checked
2026-10-05
Scope
Facility
Evidence type
Reported
Status describes
Ownership operator or developer relationship
Citation text (select to copy)

Clarion Solutions. Teton Black Bear compute campus. Canadian Data Centre Atlas. Record ab-teton-black-bear; claim pub-ab-teton-black-bear-review-5. Edition 2026-10-06-83c11c799ab4-public-2026-10-06 (publication date: 2026-10-06); evidence review through 2026-10-06. Claim evidence date: undated; source checked: 2026-10-05. https://data.clarionsolutions.ca/canada-data-centres/editions/2026-10-06-83c11c799ab4-public-2026-10-06/records/ab-teton-black-bear/#claim-pub-ab-teton-black-bear-review-5

Cite the linked primary evidence as well. Publication and access dates do not establish current operations.