Facility · Evidence reviewed 2026-10-06
Fibre Centre Ottawa
Fibre Centre · Ottawa, Ontario
Research record, not a building count. Campus and phase overlap may exist; do not add capacity values. Access dates do not establish fresh commissioning.
Identity and map provenance
- Name: Fibre Centre, Fibre Centre
- Operator: Fibre Centre, Fibre Centre
- Province: Fibre Centre, Fibre Centre
- City: Fibre Centre, Fibre Centre
- Record kind: Fibre Centre, Fibre Centre
- Disposition: Fibre Centre, Fibre Centre
City reference only; not the facility. Derived city center, rounded to four decimals. The marker is not a building, entrance, campus or parcel location. GeoNames 6094817 · CC BY 4.0
Location
ReportedFibre Centre’s earlier announcement describes opening a Michael Street colocation site in Ottawa. Its current AI page separately calls Ottawa under development; the phase relationship and completion date remain unresolved.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Operator reported site and phase
Capacity
PlannedThe current Ottawa offer targets up to 6 MW and 30,000 square feet. The 30 MW figure elsewhere on the page belongs to Moncton.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Capacity at stated basis and scope
- Quantity type
- Unspecified power
- Basis
- planned Ottawa offer
- Reported quantity
- 6 MW · up to
- AI Colocation - Fibre Centre · Fibre Centre
Power
HistoricalThe earlier Ottawa announcement described generator and redundant UPS backup, with AC/DC and A/B supply options.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Power supply or backup configuration
Cooling
PlannedFor the planned Ottawa development, Fibre Centre advertises N+1/2N cooling, a meet-me room, diverse entrances and a Layer 2 exchange. Installed immersion cooling at Ottawa is not established.
- Evidence date
- Undated source
- Checked
- 2026-10-05
- Scope
- Facility
- Evidence type
- Reported
- Status describes
- Cooling system at stated scope
- AI Colocation - Fibre Centre · Fibre Centre